1
CAUTIONS AND NOTES 2
EXTREMELY IMPORTANT 2
ETL DEFINITIONS COMPLIANT TO UL325 2
1 - OVERVIEW 2
1.1 - Gate controller 2
1.2 - Main control board 2
1.3 - ,@HMBNMSQNKAN@QCRODBHjBR 2
2 - GATE INFORMATION 3
2.1 - ASTM F2200 3
2.2 - Gate material 3
2.3 - Gate latches 3
2.4 - 2ODBHjB@OOKHB@SHNMR 3
2.5 - Swing gates 3
2.6 - General requirements 3
3 - SAFETY AND CAUTIONS 4
3.1 - Properly installed safety devices 4
3.2 -
Safety signs, notices to personnel warning signs 4
3.3 - The gate system safety devices 4
3.4 - Infrared beams and warning signs 4
3.5 - Establish the location 4
3.6 - Read and follow all instructions 4
3.7 - Keep children away 4
3.8 - Test the gate system 4
3.9 - Keep gates properly maintained 4
4 - PRE-INSTALLATION NOTES 4
4.1 - Follow Instructions 4
4.2 - Intended usage 4
4.3 - Warnings, cautions and notes 4
5 - SWING OPERATOR CUTAWAY DRAWINGS 6
6 - INSTALLATION PROCEDURES 7
6.1 - Step one-location 7
6.2 - Step two-concrete 7
6.3 - Step three-physical mounting 7
6.4 - Step
four-manual release 7
6.5 - Step
jUD-arm assembly 7
6.6 - Learning and programming features 7
6.7 - 'NVSNRDSTOSGDRXRSDLENQjQRSTRD 8
6.8 - The leaning sequence 8
6.9 - Learning mode 8
7 - CIRCUIT BOARD LAYOUT 9
8 - ACCESSORY INPUTS AND OUTPUTS 10
8.1 - Outputs 10
8.2 - Inputs 10
8.3 - Communication bus 10
8.4 - Programming the plug-in receiver and remote controls 11
9 - WIRING AND CONNECTIONS 12
10 - OPTIONAL INPUTS 12
10.1 - Fire input and fail safe connector 12
10.2 - Fail safe connection 12
10.3 - Magnetic lock connection 13
10.4 - Guard station connection 13
10.5 - Exit and edge inputs wiring diagram 13
10.6 - Radio receiver connection (third party) 13
11 - INSPECTION AND OPERATION 14
12 - GENERAL LAYOUT AND SAFETY ACCESS 14
13 - ACCESSORIES AND SENSORS 15
14 - CONTROL BOARD NOMENCLATURE 16
15 - PROGRAMMING BUTTONS 17
15.1 - Force 17
15.2 - Speed 17
15.3 - Acceleration 17
15.4 - Delay 17
15.5 - Function 17
15.6 - Display 18
16 - GATE DIRECTION REVERSAL 18
17 - RE-ASSEMBLING GATE OPERATOR 19
18 - EMERGENCY VEHICLE ACCESS 19
19 - GLOSSARY 19
20 - MAINTENANCE SCHEDULE - APOLLO GATE OPENER 20
21 - INSTALLATION DRAWING (1) 20
22 - INSTALLATION DRAWING (2) 21
23 - TEMPLATE FOR INSTALLATION (3) 22
24 - COMPACT ARM MEASUREMENTS 23
25 - GATE ARM INSTALLATION 24
26 - MECHANICAL ADJUSTMENT OF GATE CLOSING
POSITION
25
27 - APOLLO GATE OPENER TROUBLESHOOTING 25
28 - PROGRAMMING QUICKSTART 26
28.1 - Learning the gate 26
28.2 - Gate direction reversal 26
28.3 - Putting the controller into learning mode 26
29 - INSTALLATION CHECKLIST 27
TABLE OF CONTENTS