EasyManua.ls Logo

Nice WIDE L - Page 6

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Major service interval guide.
Work impact considerations
Severity index
Wide M Wide L
Jack-knife boom pole. 15% N/A
High dust and sand environment. 10% 10%
High salinity environment. 10% 10%
Aluminium fence installed. 5% 5%
Mobile pole support installed. 15% 15%
Ambient temperature above 40
o
C or below 0
o
C. 5% 5%
Operation regularly interrupted by safety beam circuit trigger. 15% 15%
Operation regularly interrupted by the Emergency Stop circuit trigger. 15% 15%
Speed set to above 50%. 15% 15%
Safety overload force level set to above 50%. 10% 10%
0
100.000
200.000
300.000
cicli di manovr e
400.000
500.000
10 20 30 40 50
Indice di gravosità (%)
60 70 80 90 100
Severity index (%)
manoeuvre cycles
Using the above table, total up the applicable work impact consider-
ations to calculate the site’s severity index. Apply the totalled up se-
verity index % to the graph on the right to estimate the total expected
number of operations before first major service.

Other manuals for Nice WIDE L

Related product manuals