EasyManuals Logo

Nilfisk-ALTO POSEIDON 7 - C3 User Manual

Nilfisk-ALTO POSEIDON 7 - C3
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
POSEIDON 7 NEW-C3_en_Ver.1.0_33/12
Adjustment / Test
31
G
Safety valve
Pic. G1: Safety valve
The safety valve’s factory setting for opening pressure = working pressure + 25 to +30 bars.
Upon each service inspection the setting must be tested and, if necessary, adjusted.
When mounting, affix ball and pressure plate to the spring with lubrication.
The seat is screwed on using a 10mm socket wrench (no gasket required).
Before testing with a pressure gauge, make sure that two threads are visible behind the locknut.
Warning: Before starting the pump, check that the test manometer valve is open. Close the valve
slowly;
pressure must never exceed 250 bars.
Pic. G2: Tool for Safety valve
6mm Allen wrench
10mm box spanner
no.: 1206754

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nilfisk-ALTO POSEIDON 7 - C3 and is the answer not in the manual?

Nilfisk-ALTO POSEIDON 7 - C3 Specifications

General IconGeneral
BrandNilfisk-ALTO
ModelPOSEIDON 7 - C3
CategoryPressure Washer
LanguageEnglish

Related product manuals