EasyManua.ls Logo

Norac UC5 - Automatic System Setup

Norac UC5
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
3.7. AutomaticSystemSetup
Allboomsectionswillmoveduringtheautomaticsetup.
Peopleandequipmentmustbeclearofsprayerboom.
Ensuretheboomshavesufficientrangetoliftfullyandareclearofanypowerlines.
Unfoldthesprayerinalocationthatisrelatively
levelandwherethesensorsareoverbaresoilorgravel.
Donotconducttheretuneoverstandingcrop,weedsorgrass.Also,avoidconcreteorasphaltsurfaces.
Ensuretheboomrollsuspensionsystemisfunctioningproperlyandsmoothly.Frictiononwearsurfaces
can be relieved using lubricants (grease, etc.) or
adjustment.Properly tuned suspension systems will
optimizeUC5™performance.
For best results, the hydraulic system should be under a normal load and at a normal working
temperature.
Start the solution pump and run the sprayer’s engine at a normal working RPM for the entire
setup.
Cycleallboom
sectionsupanddownmanuallyforfiveminutestowarmtheoil.
Fortrailedsprayers,ensureanyhydraulicflowcontrolsareadjustedfornormalfieldoperation.
Changing the hydraulic flow controls after or during the system setup will affect the UC5
performance.

Other manuals for Norac UC5

Related product manuals