EasyManua.ls Logo

Norac UC5 - Page 48

Norac UC5
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
Theboomsoperatebackwards
1. Ensurethe raiselines are connected to the “B” ports and the lower lines are connected to the “A”
ports.
2. Ensuretheelectricalconnectionsarecorrect.
3. Ensurethevalvesareconfigured(mapped)correctly.
Theboomsmovetoofastortooslow
1. Ensuretheorificesareinstalledcorrectly.Ifthe“B”portisbackwards,theboomwillmoveupslowly
anddownfast.Ifthe“A”portisbackwards,itwillraiseslowlyandmaychatterwhengoingdown.
2. Ensuretheorifices
arenotjammedintheport.Tryremovingandreinstallingtheorifices.
3. Checktoseeifthefilterisplugged.Thefiltercanberemovedtotest,butitmustbereinstalled.
4. Ensure the correct “A” and “B” port NORAC fittings are used.If the wrong fittings are used,
the
floatingorificemaynotbeoperatingcorrectly.

Other manuals for Norac UC5

Related product manuals