EasyManuals Logo

Nordyne SC038D-23A User Manual

Nordyne SC038D-23A
48 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
708809D (Replaces 708809C)
Specifi cations and illustrations subject to change
without notice or incurring obligations.
Printed in U.S.A. (09/08)
O’Fallon, MO
¢708809J¤
708809D
INSTALLATION/PERFORMANCE CHECK LIST
ELECTRICAL SYSTEM:
Electrical connections tight? YES NO
Line voltage polarity correct? YES NO
Supply Voltage: ______________________ VOLTS
Has the thermostat been
calibrated?
YES NO
Is the thermostat level? YES NO
Is the heat anticipator setting
correct?
YES NO
GAS SYSTEM:
Gas Type: (circle one)
Natural
Gas
Propane
Gas pipe connections leak
tested?
YES NO
Gas Line Pressure: __________________ (in - W.C.)
Is there adequate fresh
air supply for combustion
and ventilation?
YES NO
Installation Altitude: ____________________ (FT.)
Deration Percentage: ___________________ (%)
Furnace Input: _______________________ (Btuh)
Supply Air Temperature: ________________ (° F)
Return Air Temperature: ________________ (° F)
Temperature Rise: ____________________ (° F)
VENTING SYSTEM:
Vent free from restrictions? YES NO
Filter(s) secured in place? YES NO
Filter(s) clean? YES NO
Flue connections tight? YES NO
Is there proper draft? YES NO
INSTALLER NAME:
CITY _______________ STATE _____________
INSTALLATION ADDRESS:
CITY _______________ STATE _____________
UNIT MODEL #
UNIT SERIAL # ____________________________
Minimum clearances per
Table 3 (page 27)?
YES NO
Has the owner’s information
been reviewed with the
home-owner?
YES NO
Has the literature package
been left near the
furnace?
YES NO

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nordyne SC038D-23A and is the answer not in the manual?

Nordyne SC038D-23A Specifications

General IconGeneral
BrandNordyne
ModelSC038D-23A
CategoryFurnace
LanguageEnglish

Related product manuals