EasyManua.ls Logo

Nortek GHH09(2.6)LUK4DH - Post-Installation Checklist

Nortek GHH09(2.6)LUK4DH
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
4.Replace wiring cover and tighten the screw.
5.Close the panel.
Installation of indoor unit
Note:
Ɣ
Ɣ
All wires of indoor unit and outdoor unit should be connected by a professional.
Only single unbroken electrical wires should be used. Spliced wires are not allowed.
installation.
Ɣ)RUWKHDLUFRQGLWLRQHUZLWKRXWSOXJDFLUFXLWEUHDNHUPXVWEHLQVWDOOHGLQWKHOLQH
The circuit breaker should be all-pole parting and the contact parting distance
VKRXOGEHPRUHWKDQPPLQ
5HPRYHWKHZLUHFOLSFRQQHFWWKHSRZHUFRQQHFWLRQZLUHWRWKHZLULQJWHUPLQDO
with wire clip.
power connection
wire
cable-cross
hole
2. Lead the power wire
through the cable-cross hole at the back
RILQGRRUXQLWDQGWKHQSXOOLWRXWIURP
the front side.
2 1
2 1 L L2 G
Outdoor unit connection
24K:
2 1
2 1 LN
Outdoor unit connection
09.
09.IRUVRPHPRGHO
2 1
Outdoor unit connection
L2/
2 1
secure
wire

Other manuals for Nortek GHH09(2.6)LUK4DH

Related product manuals