5-18 Emergency power conservation recovery procedures
297-8021-545 Standard 14.02 May 2001
Emergency power conservation
Restoring the ELPP LIM to duplex operation
Application
Use this procedure to restore to duplex operation the link interface module
(LIM) in each enhanced link peripheral processor (ELPP). Perform this
procedure after you power down one unit of the LIM to conserve emergency
power.
Use this procedure to restore the ELPP LIM to duplex operation only if the
following conditions are met:
The equipment was in normal in-service operation before being shutdown.
Procedure Emergency power conservation—Shutdown in this document
was used to remove equipment from service.
Action
The following flowchart is a summary of the procedure. Use the instructions
in the step-action procedure that follow the flowchart to clear the alarm.