EasyManua.ls Logo

NorthFlo PSNF50 - Operation Instruction

NorthFlo PSNF50
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
bottom, please pay attention to it. Please hold the drainage nozzle (accessory) into the
hole and clip it well, and then connect a pipe to drain the condensation water out.
BWiring
1-Connect to appropriate power supply, the voltage should comply with the rated
voltage of the products. Earth the machine well.
2-Wiring must be handled by a professional technician according to the circuit
diagram.
3-Set leakage protector according to the local code for wiring (leakage operating
current 30mA).
4-The layout of power cable and signal cable should be orderly and not affecting each
other.
CSwitch on after finishing all wiring construction and re-checking.
VI. Operation Instruction
Picture for keys
CLOCK TIME ON TIME OFF HEAT
Power On/Off
Water Temp And
Time Setting
Timer Indicator Light
Timer On
Heating
Timer Indicator Light
Clock
Timer Off

Related product manuals