10
3 Assembly and commissioning
The machine is delivered fully equipped. It is ready for operation after assembly the diamond blade
and after connection to the appropriate power supply.
3.1 Assembly on the folding frame
Unfold the legs of the frame. Put the water tray on the frame, and the machine on the water tray.
Make sure that you don’t trap the cable and water hose between the machine and the water tray.
3.2 Cutting head
You have to detach the cutting head by unscrewing the knob securing the head against one of the
column of the machine.
3.3 Tool assembly
Only NORTON continuous rim blades with a maximum diameter of 200 mm can be used with the
TR200E.
All tools used must be selected with regard to their maximum permitted cutting speed for the
machine’s maximum permitted rotation speed.
Before mounting a new blade into the machine, switch off the machine and isolate it from the main
source of electricity.
To mount a new blade, follow these steps:
Loosen on the three screws holding the outer cover of the blade guard, and remove it.
Loosen the hexagonal nut on the blade shaft with the 19mm wrench, which holds the removable
outer flange.
Remove the outer flange.
Clean the flanges and blade shaft and inspect for wear.
Mount the blade on the shaft ensuring that direction of rotation is correct (check with the arrow
on the blade guard). Wrong direction of rotation blunts the blade quickly.
Replace outer blade flange.
Tighten hexagonal nut.
Retighten the three screws (1) maintaining the outer cover the blade shaft.
The blade bore must correspond exactly to the diameter of the blade shaft. Cracked or damaged
bore is dangerous for the operator and for the machine.