HAZARD SYMBOLS AND DEFINITIONS
Danger Sign: Indicates a hazardous situation which, if not avoided, will result in serious
injury or death.
Warning Sign: Indicates a hazardous situation which, if not avoided, could result in
serious injury or death.
Caution Sign plus Safety Alert Symbol: Indicates a hazardous situation which, if not
avoided, could result in minor or moderate injury.
Caution Sign without Safety Alert Symbol: Indicates a hazardous situation which, if not
avoided, could result in property damage.
Notice Sign: Indicates a hazardous situation which, if not avoided, could result in property
damage.
This Boiler must be installed by a licensed and trained Heating Technician, or the
Warranty is Void. Failure to properly install this unit may result in property damage,
serious injury to occupants, or possibly death.
NTI # 87137

Other manuals for NTI TFTN285

Question and Answer IconNeed help?

Do you have a question about the NTI TFTN285 and is the answer not in the manual?

NTI TFTN285 Specifications

General IconGeneral
BrandNTI
ModelTFTN285
CategoryBoiler
LanguageEnglish

Summary

Hazard Symbols and Definitions

1.0 Introduction

1.5 Boiler Vent / Air-Intake Piping

Requirements for the TFTN's special venting system for pressurized venting.

3.0 Boiler Location

3.1 Minimum Installation Clearances

Required minimum clearances around the boiler for safe installation and servicing.

4.0 General Venting

4.3 Flammable Solvents and Plastic Piping

Hazards of flammable solvents and mandatory pre-commissioning for plastic venting.

4.5 Vent Pipe Material

Table of acceptable vent pipe materials and standards for US and Canada.

4.7 Direct Vent Installation

Procedures for direct vent installation, including termination options and sidewall/roof considerations.

5.0 Vent Termination Clearances

6.0 Condensate Drain

7.0 Installing Gas Piping

8.0 Lighting the Boiler

9.0 Gas Valve and Burner Set-up

Combustion Calibration Procedure

Procedure for calibrating burner combustion using a CO2 analyzer for optimal performance.

10.0 Boiler and Heating System Piping

10.1 Water Quality

Importance of water quality for boiler lifespan and best practices for system water.

11.0 Cascade Installation

12.0 Field Wiring

13.0 Wiring Schematics

14.0 Installation Checklist

Installation

Checklist for ensuring all installation steps are completed correctly before startup.

Start-up

Steps to follow for a safe and proper initial startup of the boiler.

15.0 Annual Maintenance and Inspection

Annual Inspection Checklist

Checklist for a qualified technician to perform during annual boiler inspections.

Combustion Chamber Cleaning Procedure

Detailed steps for cleaning the boiler's combustion chamber.

Cleaning Checklist

Step-by-step guide for cleaning the combustion chamber and related components.

16.0 Display Menu Guide

16.7 Errors

Lists active errors and error history, including type, timestamp, description, and device.

17.0 Wifi Connection

18.0 Troubleshooting

Diagnostic Procedures

Steps for troubleshooting abnormal boiler operation using diagnostic menus.

Error Codes

Table listing error codes, their problems, possible remedies, and error types.