Do you have a question about the NTI TFTN285 and is the answer not in the manual?
Requirements for the TFTN's special venting system for pressurized venting.
Required minimum clearances around the boiler for safe installation and servicing.
Hazards of flammable solvents and mandatory pre-commissioning for plastic venting.
Table of acceptable vent pipe materials and standards for US and Canada.
Procedures for direct vent installation, including termination options and sidewall/roof considerations.
Procedure for calibrating burner combustion using a CO2 analyzer for optimal performance.
Importance of water quality for boiler lifespan and best practices for system water.
Checklist for ensuring all installation steps are completed correctly before startup.
Steps to follow for a safe and proper initial startup of the boiler.
Checklist for a qualified technician to perform during annual boiler inspections.
Detailed steps for cleaning the boiler's combustion chamber.
Step-by-step guide for cleaning the combustion chamber and related components.
Lists active errors and error history, including type, timestamp, description, and device.
Steps for troubleshooting abnormal boiler operation using diagnostic menus.
Table listing error codes, their problems, possible remedies, and error types.