Do you have a question about the Nu-Vu NVT-3/9 and is the answer not in the manual?
Procedures for inspecting the unit upon arrival to check for damage and ensure all parts are present.
Guidelines for positioning the unit, required clearances, and securing it to the structure.
Instructions and warnings for connecting the unit to the appropriate power source.
Details on connecting the water supply, including filter requirements and backflow protection.
Step-by-step guide for the initial power-on and pre-heating process of the unit.
Instructions for preparing, loading, and monitoring the proofer section for optimal proofing.