MISSIONS SPACE MISSION TO MARS
Program the functions for take-off:
: reference UTC 15:10:00 on 20.09.2022 - scheduled rocket take-off (mission reference).
: reference UTC 15:10:00 on 20.09.2022 - rocket take-off.
: reference UTC 01:55:00 on 21.09.2022 - upper stage separation from rocket.
: reference UTC 01:55:00 on 28.09.2022 - launcher insertion correction.
Once take-off is complete, program the functions for landing:
: reference UTC 14:56:38 on 10.06.2023 - separation of carrier and descent modules (CM-
DM).
and : reference UTC 15:25:51 on 10.06.2023 - entry interface point into the atmosphere
(EIP).
3 minutes and 12 seconds after EIP: gravity altimeter triggered.
3 minutes and 18 seconds after EIP: supersonic parachute triggered.
3 minutes and 37 seconds after EIP: supersonic parachute released.
3 minutes and 37 seconds after EIP: subsonic parachute deployed.
3 minutes and 48 seconds after EIP: front heat shield dropped.
: 5 minutes after EIP: landing module separated.
: reference UTC 15:31:39 on 10.06.2023: nominal landing.