EasyManua.ls Logo

Omega Speedmaster X-33 Marstimer - MISSIONS SPACE MISSION TO MARS; Program the functions for take-off:; Once take-off is complete, program the functions for landing:

Omega Speedmaster X-33 Marstimer
67 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
MISSIONS SPACE MISSION TO MARS
Program the functions for take-off:
: reference UTC 15:10:00 on 20.09.2022 - scheduled rocket take-off (mission reference).
: reference UTC 15:10:00 on 20.09.2022 - rocket take-off.
: reference UTC 01:55:00 on 21.09.2022 - upper stage separation from rocket.
: reference UTC 01:55:00 on 28.09.2022 - launcher insertion correction.
Once take-off is complete, program the functions for landing:
: reference UTC 14:56:38 on 10.06.2023 - separation of carrier and descent modules (CM-
DM).
and : reference UTC 15:25:51 on 10.06.2023 - entry interface point into the atmosphere
(EIP).
3 minutes and 12 seconds after EIP: gravity altimeter triggered.
3 minutes and 18 seconds after EIP: supersonic parachute triggered.
3 minutes and 37 seconds after EIP: supersonic parachute released.
3 minutes and 37 seconds after EIP: subsonic parachute deployed.
3 minutes and 48 seconds after EIP: front heat shield dropped.
: 5 minutes after EIP: landing module separated.
: reference UTC 15:31:39 on 10.06.2023: nominal landing.