7. Pre-Operation Checklists / Maintenance Checklists
After wiring, mounting and beam alignment are done, check the operation of the F3SJ-B-01T.
Pre-Operation Checklists
After installation, the highest level administrator must use the following checklist to verify the operation, plac-
ing a check mark in each of the boxes.
Checklists
- Installation Condition Check
The machine itself does not prevent the operation of safety functions such as stopping.
The hazardous part of a machine cannot be reached without passing through the detection zone of the
F3SJ-B-01T.
The system is configured so that the F3SJ-B-01T can always detect a worker who is working in the haz-
ardous zone.
The interlock reset switch is installed in a location that provides a clear view of the entire hazardous zone
and it cannot be activated from within the hazardous zone.
Safety distance has been calculated. Calculated distance: S = ( ) mm
The actual distance is equal to or greater than the calculated distance. Actual distance = ( ) mm
Reflective surfaces are not installed in prohibited zones.
Not installed in a reflective configuration.
Not used in flammable or explosive atmosphere.
- Wiring check before power is turned ON
Sharing the power supply with other devices may cause the F3SJ-B-01T to be affected by noise or volt-
age drop. It is recommended that this safety component use a dedicated power supply but do not share
with other devices.
The power supply unit provides 24 VDC while complying with the EMC Directive, Low Voltage Directive,
output holding specification.
The power supply polarity is not connected in reverse.
Emitter/receiver cables are properly connected to the respective emitters/receivers.
Double insulation is provided between input/output and hazardous voltage (commercial power source,
etc.).
Outputs are not short-circuited to 0 V line.
Loads are not connected to the 0 V line.
All lines are not connected to commercial power source.
Model of emitter and receiver must be the same.
When two or more sets of F3SJ-B-01Ts are used, they are series-connected or mutual interference pre-
vention measures are taken.
When 2 or more sets of F3SJ-B-01T are used in series connection, they must not be connected to a sen-
sor other than F3SJ-B-01T.
A cap is attached to the secondary sensor that is located farthest from the power supply.
Neither connector nor bracket must be loose.
Auxiliary output must not be used as safety output.
Power supply's +24 V must be grounded.
Wiring must not be bent, cracked, nor damaged.
-Operation Check While the Machine Is Stopped
The test rod is not deformed.
Depending on the unit's model and settings of floating blanking function, detection capability may vary.
Use a test rod with an appropriate diameter for inspection. The model name of test rod is as follows.
Model name Diameter
F39-TRD25 Dia. 25mm
Mounting/Beam Alignment
Wiring
Function Selection
Pre-Operation Checklist /
Maintenance Checklists