10. Assemble the top pole to the mid-pole.
11. Use the screw to fi x.
emble the wind sensor main body on top of the
pole. Use the screw (Type A) to fi x.
13. Open the battery compartment.
14. Using a compass, rotate the wind direction part until
indicator points to the “North”.
16. Close the battery compartment.
ert the 2 rectangular base legs into the ground to
18. To keep the pole stable, use the 3 pins to fi rmly fi x
the tension strings to the ground.
To set up the wind sensor main body on an existing
1. Remove the screw that fi xes the plastic connector
at the end of the top pole.
2. Slide down the plastic connector.
3. Detach plastic base from the bundled steel pole if
4. Assemble it at the end of the top pole using the
screw that is already attached on the base, with the
washers and bolts to fi x.
6. Slide the sleeve down to open the battery
7. Insert batteries (4 x UM-3 / AA) in the compartment,
matching the polarity (+ / -) and press
8. Slide the protective sleeve up to close the
9. Rotate the sleeve to the right to lock.
et up the steel pole support:
1. Assemble the “cone shape” guiding end with the
2. Screw the guiding end clockwise at the bottom of
3. Remove the cover hole from the plastic base.
rt the plastic base onto the steel pole until the
screw hole aligns with the support.
5. Use the screw that is already attached on the base,
with the washers and bolts to fi x.
6. Use the guiding end to start inserting the steel pole
at a perpendicular angle into the ground.
WARNING Make sure that there are NO electric
cables / power lines, gas / water pipes in the area
where you are placing the steel pole. Do not place
the pole into a hard rocky type of ground as it may
bend or break the pole. It should be inserted into
soft soil.
7. Place a wooden block on the top of the pole. With
a hammer, hit the wooden block to insert the pole at
a perpendicular angle to the ground until reaching
e the mid-pole on top of the bottom pole.
WMR100_EN_86L4515-017.indd 5 6/15/06 4:25:13 PM