EasyManua.ls Logo

Pakedge Device & Software WK-2 - Page 16

Pakedge Device & Software WK-2
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WK-2x User Guide Version v1.2
WK-2-C installation with optional pre-construction bracket
The pre-construction bracket is sold separately.
1. Place the pre-construction bracket against the bottom of the ceiling studs at the desired mounting
location.
2. Mark locations for mounting screws. Drill 1/16” pilot holes at marked locations. Secure pre-construction
bracket to ceiling studs using the provided hardware.
3. Install sheet rock over pre-construction bracket. Make note of where the cutout on the pre-construction
bracket is when installing the drywall.
4. Cut opening in sheet rock using the cutout on the pre-construction bracket as a guide.
Note: the “pakedgedevice&software inc” logo should be facing outwards.

Related product manuals