112
Operator positions
for hand cable
control
Bringing Down the Platform
Press the pushbutton (44) and keep it pressed until the
platform is adjusted flush to the ground.
After the platform has touched the ground it tilts and adjusts
to the ground.
Lifting the Platform
Press the pushbutton (42) and keep it pressed until the
platform has reached the loading position.
Before the platform is lifted it tilts to the horizontal position.
Setting the Platform to its Horizontal Position
To adjust a steeper tilt of the platform, press both
pushbuttons (42) and (43) simultaneously.
To adjust a flatter tilt or to adjust the platform flush to the
ground, press both pushbuttons (43) and (44) simultane-
ously.
1 m
1 m
1 m
250 mm