32 
12.3 Outdoor Unit 
12.3.1  Install the Outdoor Unit 
  After selecting the best location, start installation to Indoor/Outdoor Unit Installation Diagram. 
1  Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø10 mm). 
Make sure unit install in balance level to ensure that water flow out from unit drainage hole. 
2  When installing at roof, please consider strong wind and earthquake. 
Please fasten the installation stand firmly with bolt, screws or nails. 
 
AB
C
D
 
Model A B C D 
CZ25***, CZ35***  540 mm  160 mm  18.5 mm  330 mm 
12.3.2  Connect the Piping 
12.3.2.1 Connecting the Piping to Indoor 
For connection joint of all models 
Please make flare after inserting flare nut (locate at 
joint portion of tube assembly) onto the copper pipe. 
(In case of using long piping) 
 
Connect the piping 
  Align the center of piping and sufficiently tighten 
the flare nut with fingers. 
  Further tighten the flare nut with torque wrench in 
specified torque as stated in the table. 
 
Torque 
wrench
Spanner or 
Wrench
 
 
 
 
 
 
 
 
 
Additional Precautions For R32 Models when 
connecting by flaring at indoor side 
 
 
Ensure to do the re-flaring of pipes before connecting to 
units to avoid leaking. 
 
Seal sufficiently the flare nut (both gas and liquid sides) 
with neutral cure (Alkoxy type) & ammonia-free 
silicone sealant and insulation material to avoid the 
gas leak caused by freezing. 
 
Apply neutral cure 
(Alkoxy type) and 
ammonia-free silicone 
sealant along the 
circumference
 
 
Neutral cure (Alkoxy type) & ammonia-free silicone 
sealant is only to be applied after pressure testing and 
cleaning up by following instructions of sealant, only to 
the outside of the connection. The aim is to prevent 
moisture from entering the connection joint and 
possible occurrence of freezing. Curing sealant will 
take some time. Make sure sealant will not peel off 
when wrapping the insulation.
12.3.2.2 Connecting the Piping to Outdoor 
Decide piping length and then cut by using pipe cutter. 
Remove burrs from cut edge. 
Make flare after inserting the flare nut (locate at valve) 
onto the copper pipe. Align center of piping to valve 
and then tighten with torque wrench to the specified 
torque as stated in the table. 
 
 
 
 
Do not overtighten, overtightening may cause gas leakage.
 
 
Piping size  Torque 
6.35 mm (1/4")  [18 N•m (1.8 kgf•m)] 
9.52 mm (3/8")  [42 N•m (4.3 kgf•m)] 
12.7 mm (1/2")  [55 N•m (5.6 kgf•m)] 
15.88 mm (5/8")  [65 N•m (6.6 kgf•m)] 
19.05 mm (3/4")  [100 N•m (10.2 kgf•m)]