29
CAUTION
tucoT.1
ehtfoecafruslanretnieht,deralfylreporpnehW
.ssenkcihtnevefoebdnaenihsylnevelliweralf
ehthtiwtcatnocotnisemoctraperalfehtecniS
.hsiniferalfehtkcehcylluferac,snoitcennoc
gni
r
alf
r
epo
r
pmI
ecafruSdenilcnI
degamad
nevenUdekcarC
ssenkciht
eralfoT.3
raB
kramworradeR
eldnaH
eroC
ekoY
eldnahpmalC
raB
mm5.00
epipreppoC
remaeR
srrubevomeroT.2
nwodtnioP
epiP
10.3 Outdoor Unit
10.3.1 Install the Outdoor Unit
After selecting the best location, start installation according to indoor/outdoor unit installation diagram.
1 Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø10mm).
2 When installing at roof, please consider strong wind and earthquake. Please fasten the installation stand
firmly with bolt or nails.
Model A B C D
PS9*** 474 mm 87 mm 18.5 mm 261 mm
PS12*** 570 mm 105 mm 18.5 mm 320 mm
10.3.2 Connecting the Piping
10.3.2.1 Connecting the piping to indoor unit
Please make flare after inserting flare nut (locate at joint portion, of tube assembly) onto the copper pipe. (In case of
using long piping)
Connect the piping
Align the center of piping and sufficiently tighten the flare nut with fingers.
Further tighten the flare nut with torque wrench in specified torque as stated in the table.
Piping size Torque
1/4" (6.35 mm) 18 Nym (1.8 kgf.m)
3/8” (9.52 mm) 42 Nym (4.3 kgf.m)
1/2" (12.7 mm) 55 Nym (5.6 kgf.m)
5/8” (15.88 mm) 65 Nym (6.6 kgf.m)
3/4" (12.7 mm) 100 Nym (10.2 kgf.m)
Do not over tighten, over tightening cause gas leakage
10.3.2.2 Cutting and flaring the piping
1 Please cut using pipe cutter and then remove the burrs.
2 Remove the burrs by using reamer. If burrs are not removed, gas leakage may be caused. Turn the piping
end down to avoid the metal powder entering the pipe.
3 Please make flare after inserting the flare nut onto the copper pipes.
10.3.2.3 Connecting the piping to outdoor unit
Decide piping length and then cut by using pipe cutter. Remove burrs from cut edge. Make flare after inserting the
flare nut (locate at valve) onto the copper pipe. Align center of piping to valves and then tighten with torque wrench to
the specified torque as stated in the table.