EasyManua.ls Logo

Panasonic CU-E12DKE

Panasonic CU-E12DKE
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.2.3.4. Deice Control
A. Deice operation (Normal Deice Operation)
1. Detection methods
Outdoor heat exchanger temperature sensor, timer.
2. Deice operation time chart
Notes
During deice operation, as relationship for outdoor piping temperature and time T5, the priority given to the condition
which is first fulfilled and shift to the next mode.
First deice after operation restricted to 60 min. & above.
No restart operation if compressor OFF for sequence No. 8, 9.
(Instantaneous, restart)
Outdoor heat exchanger temperature
a 15°C
b 18°C
c 25°C
42
CS-E9DKEW CU-E9DKE / CS-E12DKEW CU-E12DKE
This document is protected (secured) by www.nettovarmepumpar.se

Table of Contents

Other manuals for Panasonic CU-E12DKE

Related product manuals