EasyManua.ls Logo

ParaBody 893103 - Steps 8-9: Boom Supports and Frame Tightening

ParaBody 893103
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rout
over bolts.
l
1/2 X3"
1/2 X 3" I
FIGURE 8
STEP 8:
-
¯ LOOSELY assemble Lhc TOP BOOM (2) to the UPRIGHT FRAME (I) using two I/2 X 3" BOLTS (27), one 3/8 X
BOLT (25), one I/2" LOCK WASHER (32), I/2"WASHER (30),one I/2" LOCKNUT (34), and one 3/8" LOC~-I" (36)
as shown ~ FIGUI~ 8.
1/2 X 3"
112 X 3-1/4"
CABLE
over bolts.
FIGURE 9
1/2 X 3"
STEP 9:
¯ LOOSELY assemble the LEFT (7) & RIGHT ($) BOOM SUPPORTS to the UPRIGHTS (5) and TOP BOOM (2) using
X 3" BOLTS (27), two 1/2 X 3-1/4" BOLTS (26), two 1/2" LOCK WASHERS (32), two I/2" WASHERS (30), and four
LOCKNUTS (34) as shown in FIGURE
* SECURELY TIGHTEN ALL LOOSE CONNECTIONS MADE UP TO THIS POINT!
6
5 [ I I
3 4
[ ! I_1
0 1 { ! l I
I I [ I I 1
8

Related product manuals