EasyManua.ls Logo

Parker 590 series - An Overview of the Converter; How it Works

Parker 590 series
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Parker Hannifin Corporation
Chelsea Products Division
Olive Branch, MS 38654 USA
13
Bulletin HY25-1590-M1/US
Owner’s Manual
Caterpillar
PTO Installation (Reference Page 14)
4. Install studs (1) to the transmission as shown.
CAUTION: Do not bottom out studs in holes.
5. Install until shoulder is approximately one to two threads from the
transmission mounting surface.
NOTE: To verify correct installation, measure from end of stud to transmission
mounting surface. Correct length should be between 1.31 - 1.25 in.
[33.2 - 31.8 MM]
6. Install pressure switch into Power Take-Off (PTO) – Torque to 10 - 12 lbs-ft
[13-16 Nm]
7. Position the PTO solenoid between 3 o’clock and 6 o’clock position when
viewed from rear.
8. Mount PTO to transmission using gasket (2) and flange nuts (3) provided with
PTO.
9. Tighten and torque flange nuts (3) in a crossing pattern to 50 - 60 lbs-ft
[75 - 71 Nm]
10. Install the 90° elbow in the transmission pressure port (4).
11. Connect hose (5) to the transmission port, connect other end of the hose to
the PTO 90° elbow located near the PTO solenoid.
12. Remove the 2-Bolts (6) on the transmission and use them to attach
bracket (7). Apply blue thread locktite before re-installing bolts. Torque to
74 +/- 15 lbs-ft [100 +/- 20 Nm]
13. Attach the bracket to the PTO output flange ears with the two screws
provided. Torque to 20 - 25 lbs-ft [27 - 34 Nm]
14. See page 15 for Electrical & Hydraulic Installation.
Mounting the PTO on the CAT Transmission (continued)
Installation Instructions

Other manuals for Parker 590 series

Related product manuals