1
PG8J
PG8M
Installation Instructions
SINGLE---ST AGE DELUXE
INDUCED---COMBUSTION
4---W AY MULTI POI SE FURNACE
SAFETY CONSIDERATIONS 2........................
INTRODUCTION 3..................................
CODES AND STANDARDS 4..........................
Step 1 —Safety 4..................................
Step 2 —General Installation 4.......................
Step 3 —Combustion and Ventilation Air 4..............
Step 4 —Duct Systems 5............................
Step 5 —Acoustical Lining and Fibrous Glass Duct 5......
Step 6 —Gas Piping and Gas Pipe Pressure Testing 5......
Step 7 —Electrical Connections 5.....................
Step8—Venting 5................................
LOCATION 6.......................................
General 6........................................
Location Relative to Cooling Equipment 7..............
AIR FOR COMBUSTION AND VENTILATION 7.........
Outdoor Combustion Air Method 8....................
INSTALLATION 11..................................
Bottom Return Air Inlet 11..........................
Side Return Air Inlet 11.............................
Leveling Legs (If Desired) 11........................
Bottom Return Air Inlet 12..........................
Suspended Furnace Support 12.......................
Platform Furnace Support 13.........................
Roll--Out Protection 13.............................
Bottom Return Air Inlet 13..........................
Side Return Air Inlet 13.............................
General Requirements 13............................
Ductwork Acoustical Treatment 13....................
Supply Air Connections 13..........................
Return Air Connections 20..........................
115-- V Wiring 22..................................
J--Box Relocation 22...............................
Electrical Connection to J--Box 22.....................
Power Cord Install. Furnace J--Box 23.................
BX Cable Install Furn. J--Box 23......................
24--V Wiring 25...................................
Accessories 25....................................
General Venting Requirements 25.....................
Masonry Chimney Requirements 26...................
Appliance Application Requirements 28................
Additional Venting Requirements 29...................
Sidewall Venting 30................................
START--UP, ADJUSTMENT, AND SAFETY CHECK 31.....
Step1—General 31...............................
Step 2 —Start--Up Procedures 31.....................
Step3—Adjustments 34............................
Step 4 —Check Safety Controls 37....................
Step 5 —Checklist 38..............................
SERVICE AND MAINTENANCE PROCEDURES 45.......
Step 1 —Introduction 45............................
Step 2 —Care and Maintenance 47
....................
Step 3 —Sequence of Operation 49....................
Step 4 —Wiring Diagrams 50........................
Step 5 —Troubleshooting 50.........................
ama
REGISTERED
ISO 9001:2000
CERTIFIED
NOTE: Read the entire instruction manual before starting the
installation.
Portions of the text and tables are reprinted from NFPA 54/ANSI
Z223.1--2006E, with permission of Nation Fire Protection
Association, Quincy, MA 02269 and American Gas Association,
Washington DC 20001. This reprinted material is not the
complete and official position of the NFPA or ANSI on the
referenced subject, which is represented only by the standard in
its entirely.