Do you have a question about the Pentair EVERPURE QL2-OCS2 and is the answer not in the manual?
Select location, connect to cold water, position head, and attach inlet/outlet lines.
Shut off water, cut tubing, install fittings, nuts, and ferrules correctly.
Mount head, install cartridge, turn on water, and check for leaks.
Flush cartridge for 5 minutes at maximum flow before use to remove air.
Specifies the intermittent flow rate and operating temperature range.
Defines the acceptable line pressure and filter capacity.
Lists available replacement parts with item numbers and part numbers.
Details the one-year and five-year warranty periods for elements and systems.
Outlines conditions that void the warranty and disclaims certain implied warranties.
Select location, connect to cold water, position head, and attach inlet/outlet lines.
Shut off water, cut tubing, install fittings, nuts, and ferrules correctly.
Mount head, install cartridge, turn on water, and check for leaks.
Flush cartridge for 5 minutes at maximum flow before use to remove air.
Specifies the intermittent flow rate and operating temperature range.
Defines the acceptable line pressure and filter capacity.
Lists available replacement parts with item numbers and part numbers.
Details the one-year and five-year warranty periods for elements and systems.
Outlines conditions that void the warranty and disclaims certain implied warranties.
| Brand | Pentair |
|---|---|
| Model | EVERPURE QL2-OCS2 |
| Category | Water Filtration Systems |
| Language | English |












Loading...