APPLICATION WORKSHEET
Please fill in for your records.
MODEL NUMBER_____________________________ PUMP DISTRIBUTOR:
SERIAL NUMBER_____________________________ Name_______________________________________________________
MFG. DATE_________________________________ Address______________________________________________________
PURCHASE DATE_____________________________ City_________________________________________________________
TOTAL WELL DEPTH_________________FT(M) Phone_______________________________________________________
WELL RECOVERY RATE____________________________________________________________________________________________
SOLAR ARRAY INFORMATION:
MAKE/MODEL___________________________________________________________________________________________________
WATTS AVAILABLE (NO. OF PANELS X WATTS PER PANEL= )__________________________________________________________________
CONTROLLER INFORMATION:
MAKE/MODEL___________________________________________________________________________________________________
NOTE: Use of an LCB (Linear Current Booster) Unit is required for optimum performance. LCB is not included.
TERMS:
H1=DISCHARGE HEAD = Vertical distance in feet from ground level to level of water in elevated storage tank.
H2=WATER LEVEL = Vertical distance in feet from level of water in well when pumping up to ground level.
H3=SUBMERGENCE = Vertical distance in feet from level of water in well when pumping, to pump position in well.
Note: DO NOT submerge the pump deeper than necessary unless the water level is known to
be highly variable (Pump may operate dry for short periods of time.).
Drawdown = Vertical distance in feet from static water level to water level when pumping.
Note: Make sure the pump is installed below the lowest anticipated water level.
Consider the seasonal changes in the region.
SOLAR PANELS
CONTROLLER
DISCHARGE HEAD = H1
STORAGE
TANK
WATER LEVEL = H2
DRAW DOWN
SUBMERGENCE = H3
WELL CASING DIAMETER=_________IN(cm)
LEVEL
STATIC WATER
H1= DISCHARGE HEAD =_________FT(M)
+ H2=WATER LEVEL=_________FT(M)
+ *H3=SUBMERGENCE= FT(M)
**TOTAL VERTICAL LIFT=__________FT(M)
**NOT TO EXCEED 230 FT(70m)
(WHEN PUMPING)
(ABOVE GROUND)
*NOT TO EXCEED 100 FT(30m)
Comments:
(H1 + H2 + H3)