I. PUMP CONNECTION & INSTALLATION INSTRUCTIONS
WARNING: IMPROPER INSTALLATION WILL VOID WARRANTY.
1. Select and Purchase the Proper Jacketed Cable (Fig. 1)
Note: DO NOT select cables with irregular shapes, rough
or grooved surfaces. A smooth jacket is needed for
proper sealing.
Use a #10 AWG jacketed Submersible Cable that fits
into the general size requirements shown (Fig 1).
2. Assemble Cable Boot (Fig. 2 thru 7)
2.1 Strip the outer cable jacket (A) 2.0 in. [5 cm] (Fig. 2).
2.2 Cut one of the lead wires 1.0 in. [2.5 cm] (Fig. 3).
2.3 Wrap electrical tape around the cable (A). Start 2 in.
[5 cm] below outer cable jacket and continue to taper at
a point past the end of the lead wires (Fig 4).
2.4 Generously lubricate the cable 4 to 6 in. [10 to 15 cm]
with supplied O-Ring grease.
2.5 Slide the cable boot components over the cable (A) in the following order (Fig. 4).
1. Nut (D). Make sure threads are toward pump end of cable.
2. Outer Cable Boot (C). Small end first.
3. Inner Cable Boot (B). Small end first.
2.6 Remove tape and cut the lead wires back leaving about .50 in. [1.3 cm] exposed (Fig. 5).
2.7 Strip the inner conductor jacket .50 in. [1.3 cm] (Fig. 5).
FIGURE 1
FIGURE 4
FIGURE 2
FIGURE 3
FIGURE 5