4. Parts installation
① nstall the air inlet cover and filter cotton: Put the filter cotton into the air inlet groove (filter
cotton needs to be kept dry when putting back), then put the two protrusions under the air
inlet cover, align the two slots a and b on the drying box and insert them (as shown in the
picture),press the handle of the air inlet cover until hear a "snap" sound to confirm the instal
lation.
a b
② Install the air outlet base plate: Put the front of the air outlet base plate forward (with
FRONT text facing forward)Align the bottom of the e, f, and g points on the inner wall of the
drying box, and secure tightly.
f
e
g
-18-
RETURN TO
CONTENT