English
Turn main switch, control switch, all circuit breakers to switches to the - 0 - (off) position.
Check the internal hydraulical connection (clamps and fittings) that may get loose during transportation. The removable
panels of the units are the 2 lateral panels, which are fixed with captive screws.
Picture 9 – Lateral panel
It is of utmost importance to wash the Hydraulic Circuit before commissioning the complete Cooling System. Perform the
Cleaning Procedure, before continuing Start-Up phase: wash the system with FUCHS “ Maintain professional washer LI”
(Pfannenberg part number: 46783000135 – 25kg Tank) at least for 10 minutes.
Diluition Percentace:
2% Professional Washer
98% Water
(it is recommended to use demineralized water)
CHILLER with tank: Remove cap of filling connection located at the top side of the chiller (external) or reservoir top plate
(internal).
Picture 7 – Main switch
OFF
Picture 8 – Circuit breakers
OFF
Picture 10 – Filling point