Fill reservoir with water-glycol mixture until the maximum level is reached. (water quality and treatment should be
established according to the application specifications)
Connect water inlet and outlet pipes and make a visual inspection.
Establish main power feed and alarm cable with customer’s equipment.
CHILLER with pump: Purge pumps by loosening purging screw that is located on the side of pump. Be advised that the
pump has been purged correctly when only water is visible.
Picture 11 / 12 Filling process and max level
Picture 13 Pipe connection
Picture 14 Electrical connections
Picture 15 Pump purging