USEPHOENIX.COM | 800-533-7533
6
R250| LGR Dehumidifier Installation, Operation, and Maintenance Instructions
3.7 POWER SWITCH
The power switch (right of hour meter) lights up when the unit is turned on. The
unit will continue to run in all conditions until the switch is turned off; there is no
dehumidistat.
3.8 PUMP PURGE SWITCH
This switch (left of hour meter) minimizes the water left in the condensate pump
reservoir for moving or storage. Pressing and holding the pump purge switch will
cause the condensate pump to run. Hold the switch in until the flow from the
condensate hose stops.
Always manually purge the water reservoir before transport or storage. Turn off the
power and allow the plugged in dehumidifier to rest 15 minutes before the final
purge.
3.9 HOUR METER
The digital hour meter measures the cumulative time that the unit is turned on to
tenths of an hour. It stores its total when the unit is unplugged; the previous total
will be displayed when the unit is next turned on. It resets to zero after 99,999.9
hours of operation.