EasyManua.ls Logo

PIAB CU-1A - Connections

PIAB CU-1A
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ManualCU-1A/1B/2A/2BPage 12/32
Connections
7. Connections
Note!
For more detailed information regarding
connection, see manual for vacuum
conveying system. Connection of
pneumatic signals to the vacuum
conveyor.
CU-1/2
5
1 2
42/43/44
3
4
6
7
8
Port Function Tubing dimension OD/ID (mm) Colour
1 Compressed air, in 6/4 Black
2 Bottom valve, open 4/2 Blue
3 Filter shock, signal 4/2 Brown
4 Pipe emptying signal (CU-2A/B) 4/2 White
5 Bottom valve, closed 4/2 Yellow
6 Fluidisation, signal (Optional) 4/2 White
7 Vacuum pump, start 4/2 Green
8 Level detector (Optional) 4/2
42/43/44 Remote control start/stop (Optional) 4/2 Green/yellow/blue
Note!
The connections must be plugged when not
in use.