EasyManua.ls Logo

PILLAR MACHINE H49 - Operating Procedures

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION PROCEDURES
1
2
3
Control
1—Main Power Switch
The main power disconnect switch box is located on the le side of the machine near the air regulator. The lever must be in the
up, or ONposion for the machine to operate.
2—Emergency Stop
The E-stopbuon is located in the center of the machine. Use this switch to stop the machine in an emergency. It will lock in
the down posion and the knob must be twisted to reset.
3—Zone Start Switches
The Zone Start Switchis located above the fence of each zone and will begin the operaon of the machine if the Program Run
buon on the main screen has been acvated and a part is in posion in the respecve zone to be started. The Zone Start
Switchbuon will illuminate and stay illuminated unl the operaon has been carried out in that parcular zone, or the Emer-
gency Stop buon has been pushed. The H49 has two zone.