EasyManua.ls Logo

Piper ARCHER II - Cold Weather Operation

Piper ARCHER II
286 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION
8
PIPER
AIRCRAFT
CORPORATION
HANDLING,
SERV
&
MAINT
PA-28-181,
ARCHER
II
_
(f)
Cleaning
Carpets
To
clean
carpets,
first
remove
loose
dirt
with
a
whisk
broom
or
vacuum.
For
soiled
spots
and
stubborn
stains
use
a
noninflammable
dry
cleaning
fluid.
Floor
carpets
may
be
removed
and
cleaned
like
any
household
carpet.
8.29
COLD
WEATHER
OPERATION
For
cold
weather
operation
a
winterization
plate
is
installed
on
the
inlet
opening
of
the
oil
cooler
duct
on
the
right
rear
engine
baffle.
This
plate
should
be
installed
whenever
the
ambient
temperature
reaches
50°
F
or
less.
The
plate
should
be
removed
and
stored
in
the
cockpit
when
the
ambient
temperature
exceeds
50°F.
It
is
recommended
that
an
optional
Engine
Breather
Tube
Winterization
Kit
be
installed
for
cold
weather
operation.
This
kit
is
available
through
your
Piper
Dealer/
Distributor.
REPORT:
V#-1120
ISSUED:
JULY
2,
1979
8-18

Table of Contents