EasyManua.ls Logo

Piusi CUBE 70 MC - Page 50

Piusi CUBE 70 MC
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
M0104 E
50 /64
Installation, use and maintenance
ATTENTION
For CUBE MC commissioning, no further power connections are required. All the elec-
tronic components housed in the MC BOX are already wired up and factory tested. It
is therefore NEVER necessary for the installer or station manager to open the MC
BOX except to replace the protection fuses housed on the I/O card (see photo below).
The installer should carry out a plug/socket connection for a quick section-
ing of the electric system in case of failures.
Below are the main connections and the fuses to be replaced by skilled ser-
vice technicians only.
TASTIERA
1
12
Power 230V
To Motor
I / O Card
CPU Card
DISPLAY
Card
KEY Reader
1
2
5
3
4
7
6
OPTIONAL
(RS485 + LEVEL
INDICATOR)
PULSER
K600
JUMPER

 
KEY:
1 Key reader (I-Button)
2 Display card
3 CPU card
4 Keyboard
5 I / O card
6 Jumper
7 Electrical boxes

Related product manuals