EasyManua.ls Logo

+GF+ SG 160 - Page 21

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating instructions SG 160 7 Fusion Preparation
17
The aluminum stop must always be in the shown position.
Screw in the knurled-head screw. The spring will become disengaged and a
direct pressure buildup is possible.
The groove in both eccentric screws (in front and at the back) should be
vertical. The heating plate can now be moved radially.
Mount heating bushes and spigots. The heating bushes may not be scratched
or damaged in any way.
Attention

Related product manuals