EasyManua.ls Logo

+GF+ SG 160 - Page 38

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 Fusion Operating instructions SG 160
34
The parts must be jointed according to the time indications in the socket fusion
table in chapter 9.
By turning the hand wheel, slowly push pipe and fitting into/onto the heating
bush, resp. spigot (approx. 2-3 sec) until to the end stop.
The heating time begins when the pieces are in the final position.
When the heating time is over, pull the pieces quickly apart, swing out heating
element and then join the pipe/fitting immediately to the stop gauge.
Tighten the locking screw.

Related product manuals