EasyManua.ls Logo

POOL LAB PL25 - Plumbing Example

POOL LAB PL25
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Plumbing Example
Air Blower Installation – If an air blower is installed and connected directly to venturi spa
jets, then a vented loop must be installed. This allows any potential build up of hydrogen
gas to escape from the blower line before it comes in contact with the blower motor.
NOTE: The top of the loop must be above the maximum water level in the spa.
26

Table of Contents

Related product manuals