EasyManua.ls Logo

Potterton NXR4 User Manual

Potterton NXR4
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
NOVEMBER 2003
heating specialists
Question and Answer IconNeed help?

Do you have a question about the Potterton NXR4 and is the answer not in the manual?

Potterton NXR4 Specifications

General IconGeneral
BrandPotterton
ModelNXR4
CategoryBoiler
LanguageEnglish

Summary

General Data and Dimensions

Boiler Dimensions

Details physical dimensions of NXR4 boiler models including A, B, and ØD.

Combustion Chamber Data

Provides data on mean diameter, cross sectional area, length, volume, and surface area.

Technical Data Specifications

Operational Specifications and Requirements

Fuel Consumption and Pressure

Details fuel usage rates for Natural Gas/Oil and specifies minimum operating pressure.

Flue and Ventilation Requirements

Covers flue connection, flue gas volume, and natural/mechanical ventilation needs.

Connection Sizes and Water Flow

Specifies connection sizes and water flow rates at different temperatures.

Return Temperature and Weight

Details minimum return temperature and the dry weight of the boiler.

Boiler Clearances and Footprint

Boiler Clearances

Specifies minimum clearances required around the boiler for access, erection, and maintenance.

Boiler Footprint and Base Details

Details the base requirements, footprint, and plinth considerations for boiler installation.

General Information and Components

Standard Supply Components

Lists standard components included with the boiler such as sections, smoke box, and control panel.

Boiler Controls Overview

Describes the integral control panel features: hours run meters, thermometers, thermostats, and switches.

Optional Extras and Packaging

Lists optional accessories and information on how the boiler is packaged and shipped.

Installation Guidelines and Standards

Installation Requirements

Outlines general requirements, standards, and regulations for boiler installation.

Boiler Siting and Base Preparation

Provides guidance on correct siting, base preparation, and site requirements for the boiler.

Ventilation, Flue, and Water Systems

Ventilation and Flue Requirements

Details ventilation needs, flue system considerations, and common flue systems.

Water Circulation Systems

Guidelines for setting up and operating the boiler's water circulation system, including flow rates.

Boiler Protection and Water Quality

Covers boiler protection measures, system water quality, and corrosion prevention.

Boiler Erection Safety and Handling

Boiler Erection Process

Outlines the steps for erecting the boiler, including section assembly and alignment.

Risk Assessment and PPE

Details risk assessment steps and required personal protective equipment for installation work.

Manual Handling and Confined Spaces

Provides guidance on safe manual handling and confined space precautions.

Electrical Safety and Preparation

Electrical Safety Precautions

Covers safety measures for electrical work on the boiler, including isolation and earthing.

Installation Preparation Steps

Details preparatory checks, facility requirements, and tool options before installation.

COSHH and Erection Checklist

COSHH Compliance

Information on substances hazardous to health during erection and recommended precautions.

Erection Checklist

A checklist of actions to complete before boiler erection and assembly.

Section Assembly and Fluegas Flow

Section Assembly Process

Step-by-step instructions for assembling boiler sections using nipples and sealing compounds.

Fluegas Passes and Section Build

Illustrates flue gas path and how sections are built together with diagrams.

Boiler Section Layout Configuration

Section Layout Diagrams

Diagrams showing the layout and configuration of boiler sections for different models.

Assembling Boiler Sections

Pulling Sections and Sealing

Instructions for pulling boiler sections together using assembly tools and sealing joints.

Tie Rod Fixing and Exchanger Assembly

Details on fixing tie rods and assembling the heat exchanger components.

Component Connections and Fittings

Flange and Manifold Connections

Instructions for connecting flanges and manifolds, including outlet/inlet manifolds.

Hydraulic Test and Flue Hood

Procedures for hydraulic testing, fitting the flue hood, and flue connection.

Burner Door and Support Assembly

Burner Support Plate

Steps for installing the burner support plate and related components.

Burner Door Assembly

Instructions for assembling, fitting, and sealing the burner door.

Boiler Casing Assembly Overview

Casing Exploded View

An exploded view diagram identifying all components of the boiler casing.

Fitting the Casing Components

Lagging, Uprights and Cross Members

Instructions for applying lagging, fitting uprights and cross members.

Panels and Casing Adjustment

Details on fitting casing panels and adjusting the overall casing assembly.

Instrument Panel Configuration

Control Panel Layout and Components

Identifies the components, switches, and indicators on the instrument control panel.

Instrument Panel Assembly

Control Panel Wiring and Connections

Instructions for wiring and connecting the instrument control panel to power and system components.

Cable Routing and Thermometer Installation

Cable Routing Guide

Illustrates the correct routing for electrical cables and capillaries within the boiler.

Flue Gas Thermometer Fitting

Steps for installing the flue gas thermometer into the flue duct.

Burner Cable Connections

Details on connecting the burner cables to the control panel via Weiland plugs.

Boiler and Burner Power Supply

Single Phase Power Supply

Instructions for connecting a single-phase electrical supply to the boiler instrument panel.

Three Phase Power Supply

Instructions for connecting a three-phase electrical supply to the burner and instrument panel.

Supply Connections and Interlocks

Volt Free Contacts and Gas Supply

Connecting volt-free signals and guidelines for connecting the gas supply to the burner.

Oil and Water Supply Connections

Guidelines for connecting the oil supply to the burner and water system connections.

Commissioning Procedures

Commissioning Checklist

A checklist of pre-commissioning tasks to be completed before boiler startup.

Pre-Commissioning Dry Run

Checks performed before the boiler is run with fuel, including safety controls.

Soundness Testing

Tests to ensure the gas train and valves are sound and leak-free.

Commissioning Live Run

Steps for commissioning the boiler with fuel, adjusting settings, and checking operation.

Boiler Maintenance Procedures

Cleaning Flue Surfaces

Instructions for cleaning flue surfaces, combustion chambers, and flueways.

Fuel-Specific Cleaning

Cleaning recommendations based on fuel type (Gas, Oil, Sludge Gas) for efficiency.

Ancillaries, Controls, and Interlocks Check

Maintenance checks for ancillaries, controls, and safety interlocks.

Boiler Wiring Diagram

Wiring Diagram Legend

Explains the symbols and components used in the boiler wiring diagram.

Pump Overrun Operation

Diagram and explanation of the pump overrun system using a pipe thermostat.

Volt Free Signals

Additional Volt Free Contacts

Instructions for using additional volt-free contacts for remote indication.

Boiler Components Identification

Boiler Components Overview

Identifies major boiler components using diagram labels from Fig. 22.

Boiler Parts List

Casing Parts List

Control Panel Parts List

Related product manuals