EasyManua.ls Logo

Potterton SIRIUS THREE FS 200 User Manual

Potterton SIRIUS THREE FS 200
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
MW-2000819-1
en
Installation, User and Service Manual
Floor-standing condensing gas boiler
SIRIUS THREE FS 130
SIRIUS THREE FS 150
SIRIUS THREE FS 200
SIRIUS THREE FS 250

Table of Contents

Questions and Answers:

Potterton SIRIUS THREE FS 200 Specifications

General IconGeneral
TypeFloor Standing
Fuel TypeNatural Gas
Efficiency96.5%
Weight280 kg
MountingFloor Standing
Output (BTU/h)200, 000 BTU/h
FuelNatural Gas

Summary

Safety

General Safety Instructions

Safety guidelines for installers and end users, covering hazards and precautions.

Technical Specifications

Description of the Product

Settings and Safety Devices

Describes various safety features and operational settings of the boiler.

Before Installation

Installation Regulations

Covers regulatory requirements and installer qualifications for safe installation.

Installation Requirements

Outlines critical prerequisites for water, gas, and electrical supply.

Ventilation

Specifies ventilation requirements for the boiler room according to national standards.

Connecting Diagrams and Configuration

Configuration for 1 Master Boiler and 1 Slave Boiler

Settings required to configure master and slave boilers in a cascade.

Installation

General

General principles and regulatory adherence for installation.

Connecting the Heating Circuit

Detailed steps for connecting the heating circuit, including valves and safety features.

Gas Connection

Instructions for safely connecting the gas supply to the boiler.

Air Supply/Flue Gas Outlet Connections

Guidance on installing air intake and flue gas discharge pipes.

Commissioning

Check-list Before Commissioning

Essential checks before starting the boiler for the first time.

Commissioning Procedure

Detailed steps for initial start-up, including gas, electrical, and hydraulic checks.

Checking the Gas Inlet

Procedure for verifying gas supply pressure and connection integrity.

Checking the Electrical Connections

Verification of power supply, sensors, and pump connections.

Initial Commissioning

Steps for synchronizing the control panel and setting initial parameters.

Gas Settings

Adjustment of fan speed and air/gas ratio based on gas type and output.

Setting the Air/Gas Ratio (Maximum Heat Input)

Procedure to optimize combustion at maximum heat output.

Conversion to Propane (G31)

Steps and precautions for converting the boiler to operate on propane.

Operation

Starting Up the Boiler

Steps to safely start the boiler for operation.

Settings

Maintenance

General

Importance of regular servicing and professional maintenance.

Standard Inspection and Maintenance Operations

Procedures for routine checks and maintenance tasks.

Performing the Annual Service

Detailed steps for carrying out the annual service.

Troubleshooting

Error Codes

Explains error code display and general troubleshooting advice.

List of Error Codes

Comprehensive list of error codes and their meanings.

Decommissioning