Do you have a question about the Power One AURORA PVI-7200-WIND-INTERFACE and is the answer not in the manual?
Details safety symbols used in the manual and warnings for safe operation.
Introduction to installation compliance, safety, and personnel requirements.
General operating conditions, risks, and personnel qualifications.
Guidelines for assembling and handling the device to prevent damage.
Instructions for electrical connections adhering to national regulations.
Operational guidelines, safety precautions for powered parts, and maintenance.
Recommendation to follow manufacturer's guidelines for maintenance.
Details of input/output voltage, frequency, current, power, and environmental specs.
Schematic diagram illustrating the internal components and connections of the WBI.
Diagram showing the WBI's integration within a typical wind energy system.
Explanation of various operational states like Off, Grid Check, Export, and Grid Fail.
Table detailing input/output connections, trade sizes, and glanders for US/non-US versions.
Table specifying terminals, connection types, electric ratings, and wire gauges for WBI.
Details about the open collector source for wind speed feedback and its operating parameters.
Guidelines for physically installing and mounting the WBI unit.
Details the procedure and location for connecting the equipment ground.
Instructions for connecting the diversion load resistor and verifying its value.
Guidelines for connecting the DC output to the inverter, emphasizing polarity.
Steps for connecting wind turbine input phases to the WBI terminals safely.
Overview of the commissioning process for the wind energy system.
Procedures for powering up the system, monitoring wind speed, and checking LEDs.
Steps for connecting and enabling the Aurora Wind Inverter for grid operation.