The fixing pack
Your fixing pack will include:
25mm screws (silver)
35mm screws
50mm screws
70mm screws
Clout nails (for the felt)
40mm galvanised nails
If you have ordered a Power Base, you will also receive 80mm and 100mm screws.
Please note this is a standard pack used for pent and apex sheds so there may be a number of screws / nails not
required. You will, however, receive more than enough.
Pre Assembly
1. Safely unpack your components and check that you have all the parts required. Please use the table
in the two previous few pages to view which components are required for the size you have ordered.
2. Carefully remove the pallet and any untreated packing timber. See the aftercare section on ways to
recycle these items or alternatively you can discard them.
USEFUL TIP! Re-treat the underside of the floor before assembly for additional protection and
maximum longevity.
3. Remove any transport blocks from the bottom of the blank and window panels. These are there to
offer further protection to the bottom board of the panel.
Drilling
In the instructions we will talk about screwing panels together. We recommend this is done with a drill.
Here, we suggest that you pre-drill the timber with a 3mm drill bit before inserting the screws. This will
minimise the chance the timber will split.