EasyManua.ls Logo

Power Pent - Floor Assembly

Default Icon
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PAGE 7 OF 19
Floor
1. Lay down your floor panel(s) onto your firm and level base into the desired position of your shed. Be
sure to consider any overhangs on the shed when deciding the correct position as per the
instructions regarding bases in the ‘before you start’ section.
2. For the 6x5 and 6x6 sizes, the floor will be in two sections. Here, turn the floor sections upside down
so that the floor bearers are facing up. Join the floor panels together using the 50mm screws
provided. You can then turn the floor back the right way to create the full floor. For 6x2, 6x3 and 6x4
sheds, the floor panel is in one piece.
3. Screw the two ‘heavy duty bearers’ which are two pieces of framing joined together, to the two ends
of the shed with 70mm screws. This will cover the ends of the floor joists.
USEFUL TIP! If you have purchased a POWER Base you can screw the floor to the timber POWER
base below for maximum strength and security.

Related product manuals