EasyManua.ls Logo

Power Pent - Wall Erection

Default Icon
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PAGE 8 OF 19
Walls
1. Make sure you have removed the transport blocks from the bottom of the panels as per page 6 of
the instructions.
2. Your shed will come with a number of wall sections. The quantity of these will depend which size you
ordered. Please see the components table to confirm which panels you should have for your Power
Pent Bike Shed.
3. Start with the 2ft panel that will be part of your 6ft wall position this on top of the floor panel.
Ensure the side of the panel is flush with outer edge of floor (but not sitting on the bearer). Then
position one of the end panels (which will either be 2ft, 3ft and 4ft) and secure these panels together
from the inside using the 50mm screws provided. Use three screws per join.
Note, for 6x5 and 6x6 models the ends of the shed will come in more than one section. It does not
matter which of these goes to the front and back.
Important! When securing panels together ensure they line up at the top (so the building is square) and
that only the ends of the cladding are shown, which will later be covered with corner strips). This is only in
the corner when the side meets the gable.

Related product manuals