EasyManua.ls Logo

PPS PPS25 - User Manual

PPS PPS25
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
PPS25 Electronic Memory Gauge
User Manual (Rev. 04 )
Pioneer Petrotech Services Inc.
#1, 1431 - 40th Ave. NE
Calgary, AB T2E 8N6, Canada
Phone: 1-888-PP-GAUGE (774-2843)
E-mail: infopps@pioneerps.com
Website: www.pioneerps.com

Questions and Answers

PPS PPS25 Specifications

General IconGeneral
BrandPPS
ModelPPS25
CategoryMeasuring Instruments
LanguageEnglish

Summary

Scope

Responsibilities

2.1 Implementation

Field Service Manager/Location Manager ensures procedure implementation.

2.2 Supervision

Field supervisor/engineer ensures procedure is followed.

2.3 Verification

Service Quality Coach verifies procedure implementation.

2.4 Verification Method

Verification via periodic unscheduled audits of files.

2.5 References

Lists procedures and forms for gauge operations.

Introduction

3.1 Overview

PPS designed memory gauges since 2001 for well testing.

3.2 PPS25 Gauge

Memory gauge with Silicon-Sapphire transducer for high data quality.

3.3 PPS25-XM Gauge

Gauge for extreme temp/hostile environments with metal-to-metal seal.

Getting Started

4.1 Working Mode of PPS25 Gauges

Explains Sampling, Stand-by, and Communication modes for gauges.

4.2 Materials

Lists necessary items for gauge operation, refers to Appendix C.

4.3 Inspecting Gauges

Details bench test and software diagnostics for gauge functionality.

4.4 Programming Gauges

Procedure for programming gauges using Gauges Control Sheet and SmartView.

4.5 Activating and Testing Battery Packs

Steps to activate and test battery packs using a PPS Battery Tester.

4.6 Installing Battery Pack

Procedure for installing battery packs into the gauge, including alignment and initialization.

4.7 Assembling Battery Housing

Instructions for assembling battery housing, including checks, greasing, and torquing.

4.8 Downloading Data

Steps for downloading recorded job files using SmartView software.

Maintenance

5.1 Field Maintenance

Regular maintenance performed before each operation to ensure functionality.

5.1.1 Replacing o-rings

Procedure for applying grease and replacing o-rings on the gauge.

5.1.2 O-rings Location

Diagram showing the location of O-rings for different gauge sizes.

5.1.3 O-Rings Choices under different conditions

Guidance on selecting O-rings based on H2S/CO2, pressure, and temperature.

5.1.4 Cleaning the front of pressure sensor

Procedure for cleaning the pressure sensor diaphragm after use.

5.1.5 Installing and removing the protector of pressure sensor

Steps for installing and removing the sensor protector using grease and tools.

5.1.6 Checking battery housing

Instructions for checking the battery housing bore for damage.

5.2 Manufacturers Maintenance

Maintenance services performed at PPS facility, including testing and calibration.

Troubleshooting

Appendix A: Specifications

Appendix B: Power Consumption Table

Appendix C: Accessories

Appendix D: Battery Packs