EasyManua.ls Logo

PPS RPS 110CC - Maintenance Schedule; Engine Oil and Spark Plug Schedule; Air Cleaner and Drive Chain Schedule; Brake System and Clutch Schedule

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
TABLE OF TORQUE OF FASTENERS
Ser.
No.
Fastener
Torque
(Newton/m)(Foot/lb)
1
Nut for tightening upper joining plate of
front fork with vertical tube
40~50 Nm(30~37 ft.lb.
2
Nuts for fixing engine
20~25 Nm(15~18 ft.lb.)
3
Bolt for tightening upper joining plate or
front fork with shock absorber
15~20 Nm(11~15 ft.lb.)
NOTE: RPS125S model is quoted in the following contents. The pictures of other models are
the same and will not be repeated.

Related product manuals