EasyManuals Logo

ProBreeze PB-AC01 User Manual

ProBreeze PB-AC01
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
07 | English
Prior to and after installation adhere to
the below:
When moving the appliance to the chosen
location ensure it is kept in an upright position.
Do not place or use the appliance, power cord,
or any accessories in a bathroom, wet, or damp
place.
Place the appliance on a flat and dry surface.
Keep it at least 50cm away from surrounding
walls and/or objects.
Leave the appliance in an upright position for
at least two hours before first use.
Exhaust Hose Short Connector Installation
Align the two halves and click firmly together.
Stand the heat exhaust hose upright with the
circular connector at the bottom.
Place the exhaust hose short connector on top
of the heat exhaust hose and push down firmly
so that the neck sits over the heat exhaust hose.
Holding the heat exhaust hose firmly at the
bottom rotate the exhaust hose short connector
counterclockwise locking the three screw
threads onto the heat exhaust hose.
C-Shaped Buckle Installation
Align the c-shaped buckles rotary hole with
the rotation shaft and slide fully onto the
rotation shaft.
Rotate the c-shaped buckle counterclockwise
until it locks over the snap joint.
1.
2.
Rotary hole
Rotation shaft
Snap joint
Side view A
Side view B
1
2
1.
2.
3.
4.
2
3
1
Installation

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ProBreeze PB-AC01 and is the answer not in the manual?

ProBreeze PB-AC01 Specifications

General IconGeneral
BrandProBreeze
ModelPB-AC01
CategoryAir Conditioner
LanguageEnglish

Related product manuals