EasyManua.ls Logo

Procom ECON-A - Page 4

Default Icon
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
◦ 1 Phase / 3 Phase Voltage
◦ 1 Phase / 3 Phase Current
◦ Frequency
◦ PF,KW,Kwh & KVA.
◦ Battery Voltage
◦ Water Temperature
◦ Oil Pressure
◦ Fuel Level
◦ RPM
◦ Run Hour
◦ Service Due Hour
•
Protection / Supervision Mains
◦ Under/Over Voltage
◦ Under/Over Frequency
◦ Phase Sequence
◦ Voltage Unbalance
◦ Overload
•
Protection / Supervision DG
◦ Under/Over Voltage
◦ Under/Over Frequency
◦ Current Unbalance
◦ Over Speed
◦ Overload
◦ RWL
◦ LLOP
◦ HWT
◦ LFL
◦ Charging Alternator/V-belt
◦ Emergency off
◦ Service Due
◦ Fail To Start(only when configured as AMF controllers).
◦ Fail To Stop(only when configured as AMF controllers).
• Digital Input : Eight digital(4 fixed and 4 programmable)
• Analog Input: and three Analog input (sensor measurement)
• Output : Nine digital (five fixed and three programmable) and one for charging Alternator
• Modes : Configurable Auto, Semi auto and manual mode of operation.
• Fault Data Recording : Last 32 fault with date and time stamping
• Event Recording : Last 32 event
• Start Stop Recording: Last 100 records
• Password Protection :Three digit password protection for system settings.
• Real Time Clock (RTC)
• Communication : RS232, USB, RS485(Optinal)
• Timers:: Programmable DG on delay, DG continuous on time, DG rest Time, warm up time along
with 33 other time
• Provision for switching ON or OFF the measurement for individual sensors.
• Option of warning or tripping on sensor open.
• Programmable engine on detection based on ignition voltage, oil pressure build up or on both.
Cat_ECON-06-15 -Ver1.0. Page 4/21