EasyManua.ls Logo

Procom FBD28T - Built-in Fireplace Installation; Framing and Fireplace Placement; Clearance to Combustibles

Procom FBD28T
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Fig. 8 - Rough Opening for Installing in Corner
IMPORTANT: When nishing your rebox, combustible
materials such as wall board, gypsum board, sheet rock,
drywall, plywood, etc, must have ½ -in. clearance to the sides
and top of the rebox. Combustible materials should never
overlap the rebox front.
WARNING: Do not allow any combustible materials to
overlap the rebox front.
WARNING: Do not allow combustible or noncombustible
materials to cover any necessary openings like louvered
slots.
WARNING: Never modify or cover the louvered slots on
the front of the rebox.
Step 1
Step 3
Step 2
Fig 9
Remove two
screws on top
rebox panel
Insert three
screws on
hood
Assembling Hood
CAUTION: Do not operate replace without hood in place.
1. Fireplace hood is positioned on top of shipping inner pack.
2. Remove top of rebox by unscrewing two screws located
on each end. Insert the hood along the upper side of the
heat insulation board (see Fig. 9). Attach the hood with
3 screws. Re-attach the rebox top by re-inserting the two
screws.

Other manuals for Procom FBD28T

Related product manuals