EasyManua.ls Logo

Project 2000 EuroLoft - Resources Required; Prior to Installation

Project 2000 EuroLoft
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev: 05.21.18 Page 3
EuroLoft™ Bed Lift (Overhead) OEM
Cordless or Electric Drill or Screw Gun
Appropriate Drive Bits
Appropriate Drill Bits
Pneumatic Rivet Gun
Level
Saw Horses
Hex Key (4 mm)
Socket Wrench (8 mm)
Pencil
NOTE: Always install the bed lifting system taking into account the system maximum load. THE BED UNIT,
AS A WHOLE-INCLUDING BED LIFTING SYSTEM, MATTRESS, PILLOW, BLANKETS, ETC. - MUST NOT
WEIGH MORE THAN 132 lbs.
NOTE: The bed lifting system can bear a total maximum weight of 800 lbs.
Resources Required
Prior to Installation
All installation operations shall be carried out by skilled and authorized staff. Remove the product from
packaging.
Unpacking the Bed Frame
1. Make sure the bottom of the bed is facing up, the motor should be easily accessible.
2. Remove and set aside the subassembly component kit (Fig.1) packaged with the bed frame.
3. Remove and set aside the two stabilizer channel guides (Fig. 2) packaged with the bed frame.
Fig. 1
Fig. 2