26
Installation
| 26 | Version 1.0
INSTALLATION PROCESS:
• Electric chain hoists must be grounded properly.
• Lock-out and tag-out the main disconnect switch in ed-energized position before performing any service on hoist.
• Customer must provide power supply cable, fuses, and main disconnect switch.
• Check supply voltage is same as nameplate voltage on hoist.
• Check voltage does not vary by more than ±10% from nominal value.
• Do not use conductors smaller than those listed in this User Manual to supply power to hoist.
• Never bypass limit switches, remove limit switch stops, or alter limit switch devices.
• Check the electric installation and wire gauge selection at www.prowinch.com and Follow this simple steps)
LOCATE THE
QR CODE
SCAN IT WAIT FOR
THE PAGE TO
LOAD
USE
INFORMATION
SCAN FOR
MORE INFO
LOADING...